{"id":70909,"date":"2026-11-24T15:02:40","date_gmt":"2026-11-24T20:02:40","guid":{"rendered":"https:\/\/www.hampstead.qc.ca\/?p=70909"},"modified":"2026-11-24T15:03:38","modified_gmt":"2026-11-24T20:03:38","slug":"water-service-interruption-stratford-northcote-ellerdale","status":"publish","type":"post","link":"https:\/\/www.hampstead.qc.ca\/en\/water-service-interruption-stratford-northcote-ellerdale\/","title":{"rendered":"Water service interruption | Stratford &#8211; Northcote &#8211; Ellerdale"},"content":{"rendered":"<p>Hello,<\/p>\n<p>As part of our ongoing water valve replacement program, excavation work is planned at the corner of Northcote and Stratford on <strong>Wednesday, November 25, 2026<\/strong>.<\/p>\n<p>Residents in the affected area should expect a <strong>water service interruption beginning at noon and lasting until the work is completed<\/strong>.<\/p>\n<p>In total, <strong>27 residences will be affected<\/strong>. <strong>4-litre bottles of water<\/strong> will be available from Public Works upon request for residents who need them during the interruption.<\/p>\n<p>The intersection will also be closed while crews are working. Detour and road closure signs will be installed to help keep vehicles and pedestrians moving safely around the work area.<\/p>\n<p><strong>The following residences will be affected:<\/strong><\/p>\n<p><strong>Stratford:<\/strong> 44, 46, 48, 50, 60, 64, 66, 68, 70, 72, 74, 43, 45, 47, 49, 55, 57, 59, 63, 65, 67, 69, 71, 73<\/p>\n<p><strong>Northcote:<\/strong> 5, 10<\/p>\n<p><strong>Ellerdale:<\/strong> 20<\/p>\n<p>Thank you for your patience and cooperation while our crews complete this work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hello, As part of our ongoing water valve replacement program, excavation work is planned at the corner of Northcote and Stratford on Wednesday, November 25, 2026. Residents in the affected area should expect a water service interruption beginning at noon and lasting until the work is completed. In total, 27 residences will be affected. 4-litre bottles of water will be available from Public Works upon request for residents who need them during the interruption. The intersection will also be closed while crews are working. Detour and road closure signs will be installed to help keep vehicles and pedestrians moving safely<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-70909","post","type-post","status-publish","format-standard","hentry","category-non-categorise"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/posts\/70909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=70909"}],"version-history":[{"count":2,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/posts\/70909\/revisions"}],"predecessor-version":[{"id":70914,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/posts\/70909\/revisions\/70914"}],"wp:attachment":[{"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=70909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=70909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hampstead.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=70909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}