Please be advised that as part of the ongoing pipe lining work, there will be a planned water supply interuption on chemin Queen Mary (Finchley to Dufferin).

Wednesday, August 23, from 8 a.m. to 12 p.m.

Residents directly impacted will receive a paper notice from the contracting company ForAction. During this time, there will be no water supply in your home. Please note that if you are connected to a temporary water source, you should not be affected. It is strongly advised to ensure that you have enough water stored to meet your essential needs during the specified time frame.

Post-Restoration:

Once the water supply is restored, it is highly recommended that you take precautionary measures to remove any initial sediments that may be present in the pipes. To do so, please follow these steps:

  • Open an exterior faucet (garden tap) or the bath faucet.
  • Allow a moderate flow of water for a few minutes.

This will help flush out any sediments that might have accumulated during the pipe lining work.

We apologize for any inconvenience caused.

For more information, please visit Hampstead’s Info-travaux page and refer to the section on pipe lining.

Catégories

Uncategorized